Machining Surface Time for Minimum Cost is the time for processing when the workpiece is machined to obtain the minimum cost of machining. Check FAQs
tmin=AmRsg
tmin - Machining Surface Time For Minimum Cost?Am - Surface Area of Workpiece?Rsg - Surface Generation Rate?

Machining Time for Minimum Cost given Surface Generation rate Example

With values
With units
Only example

Here is how the Machining Time for Minimum Cost given Surface Generation rate equation looks like with Values.

Here is how the Machining Time for Minimum Cost given Surface Generation rate equation looks like with Units.

Here is how the Machining Time for Minimum Cost given Surface Generation rate equation looks like.

56.1278Edit=60804.9Edit1083.33Edit
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Machining Time for Minimum Cost given Surface Generation rate

Machining Time for Minimum Cost given Surface Generation rate Solution

Follow our step by step solution on how to calculate Machining Time for Minimum Cost given Surface Generation rate?

FIRST Step Consider the formula
tmin=AmRsg
Next Step Substitute values of Variables
tmin=60804.9mm²1083.33mm²/s
Next Step Convert Units
tmin=0.06080.0011m²/s
Next Step Prepare to Evaluate
tmin=0.06080.0011
Next Step Evaluate
tmin=56.1277727008391s
LAST Step Rounding Answer
tmin=56.1278s

Machining Time for Minimum Cost given Surface Generation rate Formula Elements

Variables
Machining Surface Time For Minimum Cost
Machining Surface Time for Minimum Cost is the time for processing when the workpiece is machined to obtain the minimum cost of machining.
Symbol: tmin
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Surface Area of Workpiece
The Surface Area of Workpiece is defined as the total surface/lateral surface area of the workpiece.
Symbol: Am
Measurement: AreaUnit: mm²
Note: Value should be greater than 0.
Surface Generation Rate
Surface Generation Rate is defined as the constant for every material of the workpiece.
Symbol: Rsg
Measurement: Kinematic ViscosityUnit: mm²/s
Note: Value should be greater than 0.

Other formulas in Machining Time category

​Go Time Proportion of Cutting Edge Engagement for Maximum Power delivery given Machining Cost
Q=T(Cmtp)-MMtc+Ct
​Go Machining Time for Maximum Power given Machining Cost
tp=CmM+(QMtc+CtT)
​Go Machining Time for optimum speed for Maximum Power given Machining Cost
tmc=tp(((CmMtp)-1)1-nn)n
​Go Surface Generation Rate
Rm=Amtmc

How to Evaluate Machining Time for Minimum Cost given Surface Generation rate?

Machining Time for Minimum Cost given Surface Generation rate evaluator uses Machining Surface Time For Minimum Cost = (Surface Area of Workpiece)/Surface Generation Rate to evaluate the Machining Surface Time For Minimum Cost, The Machining Time for Minimum Cost given Surface Generation rate is the time for processing when the workpiece is machined to obtain the minimum cost of Machining. Machining Surface Time For Minimum Cost is denoted by tmin symbol.

How to evaluate Machining Time for Minimum Cost given Surface Generation rate using this online evaluator? To use this online evaluator for Machining Time for Minimum Cost given Surface Generation rate, enter Surface Area of Workpiece (Am) & Surface Generation Rate (Rsg) and hit the calculate button.

FAQs on Machining Time for Minimum Cost given Surface Generation rate

What is the formula to find Machining Time for Minimum Cost given Surface Generation rate?
The formula of Machining Time for Minimum Cost given Surface Generation rate is expressed as Machining Surface Time For Minimum Cost = (Surface Area of Workpiece)/Surface Generation Rate. Here is an example- 56.12777 = (0.0608049)/0.00108333.
How to calculate Machining Time for Minimum Cost given Surface Generation rate?
With Surface Area of Workpiece (Am) & Surface Generation Rate (Rsg) we can find Machining Time for Minimum Cost given Surface Generation rate using the formula - Machining Surface Time For Minimum Cost = (Surface Area of Workpiece)/Surface Generation Rate.
Can the Machining Time for Minimum Cost given Surface Generation rate be negative?
No, the Machining Time for Minimum Cost given Surface Generation rate, measured in Time cannot be negative.
Which unit is used to measure Machining Time for Minimum Cost given Surface Generation rate?
Machining Time for Minimum Cost given Surface Generation rate is usually measured using the Second[s] for Time. Millisecond[s], Microsecond[s], Nanosecond[s] are the few other units in which Machining Time for Minimum Cost given Surface Generation rate can be measured.
Copied!