Load Factor given Average Load and Maximum Demand Formula

Fx Copy
LaTeX Copy
Load Factor is the ratio of average load to the maximum demand during a given period. Check FAQs
Load Factor=Avg LoadMax Demand
Load Factor - Load Factor?Avg Load - Average Load?Max Demand - Maximum Demand?

Load Factor given Average Load and Maximum Demand Example

With values
With units
Only example

Here is how the Load Factor given Average Load and Maximum Demand equation looks like with Values.

Here is how the Load Factor given Average Load and Maximum Demand equation looks like with Units.

Here is how the Load Factor given Average Load and Maximum Demand equation looks like.

0.65Edit=1105Edit1700Edit
You are here -
HomeIcon Home » Category Engineering » Category Electrical » Category Power Plant Operations » fx Load Factor given Average Load and Maximum Demand

Load Factor given Average Load and Maximum Demand Solution

Follow our step by step solution on how to calculate Load Factor given Average Load and Maximum Demand?

FIRST Step Consider the formula
Load Factor=Avg LoadMax Demand
Next Step Substitute values of Variables
Load Factor=1105kW1700kW
Next Step Convert Units
Load Factor=1.1E+6W1.7E+6W
Next Step Prepare to Evaluate
Load Factor=1.1E+61.7E+6
LAST Step Evaluate
Load Factor=0.65

Load Factor given Average Load and Maximum Demand Formula Elements

Variables
Load Factor
Load Factor is the ratio of average load to the maximum demand during a given period.
Symbol: Load Factor
Measurement: NAUnit: Unitless
Note: Value should be less than 1.0001.
Average Load
Average Load is the average load occurring on the power station in a given period known as an average load.
Symbol: Avg Load
Measurement: PowerUnit: kW
Note: Value should be greater than 0.
Maximum Demand
Maximum Demand is defined as the peak power consumption of the load connected.
Symbol: Max Demand
Measurement: PowerUnit: kW
Note: Value should be greater than 0.

Other formulas in Power Plant Operational Factors category

​Go Average Load for Load Curve
Avg Load=AL24
​Go Unit Generated per Annum
Pg=Max DemandLoad Factor8760
​Go Demand Factor
Demand Factor=Max DemandConnected Load
​Go Average Load
Avg Load=Max DemandLoad Factor

How to Evaluate Load Factor given Average Load and Maximum Demand?

Load Factor given Average Load and Maximum Demand evaluator uses Load Factor = Average Load/Maximum Demand to evaluate the Load Factor, Load Factor given Average Load and Maximum Demand is the ratio of average load to the maximum demand during a given period. Load Factor is denoted by Load Factor symbol.

How to evaluate Load Factor given Average Load and Maximum Demand using this online evaluator? To use this online evaluator for Load Factor given Average Load and Maximum Demand, enter Average Load (Avg Load) & Maximum Demand (Max Demand) and hit the calculate button.

FAQs on Load Factor given Average Load and Maximum Demand

What is the formula to find Load Factor given Average Load and Maximum Demand?
The formula of Load Factor given Average Load and Maximum Demand is expressed as Load Factor = Average Load/Maximum Demand. Here is an example- 0.65 = 1105000/1700000.
How to calculate Load Factor given Average Load and Maximum Demand?
With Average Load (Avg Load) & Maximum Demand (Max Demand) we can find Load Factor given Average Load and Maximum Demand using the formula - Load Factor = Average Load/Maximum Demand.