Fx Copy
LaTeX Copy
Current underground DC is defined as the current flowing through the overhead ac supply wire. Check FAQs
C1=6P3Vmcos(θ)
C1 - Current underground DC?P - Power Transmitted?Vm - Maximum Voltage?θ - Theta?

Load Current Per Phase (3-Phase 3-Wire US) Example

With values
With units
Only example

Here is how the Load Current Per Phase (3-Phase 3-Wire US) equation looks like with Values.

Here is how the Load Current Per Phase (3-Phase 3-Wire US) equation looks like with Units.

Here is how the Load Current Per Phase (3-Phase 3-Wire US) equation looks like.

4.714Edit=6300Edit360Editcos(30Edit)
You are here -
HomeIcon Home » Category Engineering » Category Electrical » Category Power System » fx Load Current Per Phase (3-Phase 3-Wire US)

Load Current Per Phase (3-Phase 3-Wire US) Solution

Follow our step by step solution on how to calculate Load Current Per Phase (3-Phase 3-Wire US)?

FIRST Step Consider the formula
C1=6P3Vmcos(θ)
Next Step Substitute values of Variables
C1=6300W360Vcos(30°)
Next Step Convert Units
C1=6300W360Vcos(0.5236rad)
Next Step Prepare to Evaluate
C1=6300360cos(0.5236)
Next Step Evaluate
C1=4.71404520791032A
LAST Step Rounding Answer
C1=4.714A

Load Current Per Phase (3-Phase 3-Wire US) Formula Elements

Variables
Functions
Current underground DC
Current underground DC is defined as the current flowing through the overhead ac supply wire.
Symbol: C1
Measurement: Electric CurrentUnit: A
Note: Value can be positive or negative.
Power Transmitted
Power Transmitted is the amount of power that is transferred from its place of generation to a location where it is applied to perform useful work.
Symbol: P
Measurement: PowerUnit: W
Note: Value should be greater than 0.
Maximum Voltage
Maximum Voltage the highest voltage rating for electrical devices.
Symbol: Vm
Measurement: Electric PotentialUnit: V
Note: Value can be positive or negative.
Theta
Theta is an angle that can be defined as the figure formed by two rays meeting at a common endpoint.
Symbol: θ
Measurement: AngleUnit: °
Note: Value can be positive or negative.
cos
Cosine of an angle is the ratio of the side adjacent to the angle to the hypotenuse of the triangle.
Syntax: cos(Angle)
sqrt
A square root function is a function that takes a non-negative number as an input and returns the square root of the given input number.
Syntax: sqrt(Number)

Other Formulas to find Current underground DC

​Go Load Current using Line Losses (DC Three-Wire US)
C1=Pline2R1
​Go Current using Line Losses (3-Phase 3-Wire US)
C1=Pline3R1

Other formulas in Current and Voltage category

​Go Maximum Voltage using Volume of Conductor Material(DC Three-Wire US)
Vm=5ρ(Pl)2PlineV
​Go Maximum Voltage using Area of X-Section (DC Three-Wire US)
Vm=2(P2)ρlPlineA
​Go Maximum Voltage using Line Losses (DC Three-Wire US)
Vm=2(P2)R1Pline
​Go Maximum Voltage using Volume of Conductor Material (3-Phase 3-Wire US)
Vm=6ρ(Pl)2PlineV(cos(θ))2

How to Evaluate Load Current Per Phase (3-Phase 3-Wire US)?

Load Current Per Phase (3-Phase 3-Wire US) evaluator uses Current underground DC = (sqrt(6)*Power Transmitted)/(3*Maximum Voltage*cos(Theta)) to evaluate the Current underground DC, The Load Current Per Phase (3-phase 3-wire US) formula is defined as the current that flows into the load of the three-phase three-wire underground system. Current underground DC is denoted by C1 symbol.

How to evaluate Load Current Per Phase (3-Phase 3-Wire US) using this online evaluator? To use this online evaluator for Load Current Per Phase (3-Phase 3-Wire US), enter Power Transmitted (P), Maximum Voltage (Vm) & Theta (θ) and hit the calculate button.

FAQs on Load Current Per Phase (3-Phase 3-Wire US)

What is the formula to find Load Current Per Phase (3-Phase 3-Wire US)?
The formula of Load Current Per Phase (3-Phase 3-Wire US) is expressed as Current underground DC = (sqrt(6)*Power Transmitted)/(3*Maximum Voltage*cos(Theta)). Here is an example- 4.714045 = (sqrt(6)*300)/(3*60*cos(0.5235987755982)).
How to calculate Load Current Per Phase (3-Phase 3-Wire US)?
With Power Transmitted (P), Maximum Voltage (Vm) & Theta (θ) we can find Load Current Per Phase (3-Phase 3-Wire US) using the formula - Current underground DC = (sqrt(6)*Power Transmitted)/(3*Maximum Voltage*cos(Theta)). This formula also uses Cosine (cos), Square Root (sqrt) function(s).
What are the other ways to Calculate Current underground DC?
Here are the different ways to Calculate Current underground DC-
  • Current underground DC=sqrt(Line Losses/(2*Resistance underground DC))OpenImg
  • Current underground DC=sqrt(Line Losses/(3*Resistance underground DC))OpenImg
Can the Load Current Per Phase (3-Phase 3-Wire US) be negative?
Yes, the Load Current Per Phase (3-Phase 3-Wire US), measured in Electric Current can be negative.
Which unit is used to measure Load Current Per Phase (3-Phase 3-Wire US)?
Load Current Per Phase (3-Phase 3-Wire US) is usually measured using the Ampere[A] for Electric Current. Milliampere[A], Microampere[A], Centiampere[A] are the few other units in which Load Current Per Phase (3-Phase 3-Wire US) can be measured.
Copied!