Load Current (2-Wire Mid-Point DC US) evaluator uses Current underground DC = Power Transmitted/Maximum Voltage to evaluate the Current underground DC, The Load Current (2-wire Mid-point DC US) formula is defined as the current that flows into the load of the single-phase two-wire underground system. Current underground DC is denoted by C1 symbol.
How to evaluate Load Current (2-Wire Mid-Point DC US) using this online evaluator? To use this online evaluator for Load Current (2-Wire Mid-Point DC US), enter Power Transmitted (P) & Maximum Voltage (Vm) and hit the calculate button.