Load Current (2 Phase 4 Wire US) evaluator uses Current Underground AC = sqrt(2)*Power Transmitted/(Maximum Voltage Underground AC*cos(Phase Difference)) to evaluate the Current Underground AC, The Load Current (2 phase 4 wire US) formula is defined as the current that flows into the load of the two-phase four-wire underground system. Current Underground AC is denoted by I symbol.
How to evaluate Load Current (2 Phase 4 Wire US) using this online evaluator? To use this online evaluator for Load Current (2 Phase 4 Wire US), enter Power Transmitted (P), Maximum Voltage Underground AC (Vm) & Phase Difference (Φ) and hit the calculate button.