Labour Mix Variance evaluator uses Labour Mix Variance = Standard Rate*(Reversed Standard Rate-Actual Time) to evaluate the Labour Mix Variance, Labour Mix Variance measures the difference between the actual labour mix and the budgeted labour mix. Labour Mix Variance is denoted by LMV symbol.
How to evaluate Labour Mix Variance using this online evaluator? To use this online evaluator for Labour Mix Variance, enter Standard Rate (SR), Reversed Standard Rate (RSR) & Actual Time (AT) and hit the calculate button.