Initial Bolt Load to seat Gasket Joint Formula

Fx Copy
LaTeX Copy
Initial bolt load to seat the gasket joint contact surface is defined as load in terms of either a concentrated force or a prescribed change in length. Check FAQs
Wm2=πbgGysl
Wm2 - Initial Bolt Load to Seat the Gasket Joint?bg - Width of u-collar in Gasket?G - Gasket Diameter?ysl - Gasket Unit Seating Load?π - Archimedes' constant?

Initial Bolt Load to seat Gasket Joint Example

With values
With units
Only example

Here is how the Initial Bolt Load to seat Gasket Joint equation looks like with Values.

Here is how the Initial Bolt Load to seat Gasket Joint equation looks like with Units.

Here is how the Initial Bolt Load to seat Gasket Joint equation looks like.

1629.4561Edit=3.14164.21Edit32Edit3.85Edit
You are here -
HomeIcon Home » Category Physics » Category Mechanical » Category Design of Machine Elements » fx Initial Bolt Load to seat Gasket Joint

Initial Bolt Load to seat Gasket Joint Solution

Follow our step by step solution on how to calculate Initial Bolt Load to seat Gasket Joint?

FIRST Step Consider the formula
Wm2=πbgGysl
Next Step Substitute values of Variables
Wm2=π4.21mm32mm3.85N/mm²
Next Step Substitute values of Constants
Wm2=3.14164.21mm32mm3.85N/mm²
Next Step Convert Units
Wm2=3.14160.0042m0.032m3.9E+6Pa
Next Step Prepare to Evaluate
Wm2=3.14160.00420.0323.9E+6
Next Step Evaluate
Wm2=1629.45614482273N
LAST Step Rounding Answer
Wm2=1629.4561N

Initial Bolt Load to seat Gasket Joint Formula Elements

Variables
Constants
Initial Bolt Load to Seat the Gasket Joint
Initial bolt load to seat the gasket joint contact surface is defined as load in terms of either a concentrated force or a prescribed change in length.
Symbol: Wm2
Measurement: ForceUnit: N
Note: Value should be greater than 0.
Width of u-collar in Gasket
Width of u-collar in Gasket is definied as the measurement or extent of u-collar from side to side.
Symbol: bg
Measurement: LengthUnit: mm
Note: Value should be greater than 0.
Gasket Diameter
Gasket Diameter is a straight line passing from side to side through the centre of a gasket.
Symbol: G
Measurement: LengthUnit: mm
Note: Value should be greater than 0.
Gasket Unit Seating Load
Gasket Unit Seating Load is the seating load on per unit area o the sealing gasket.
Symbol: ysl
Measurement: StressUnit: N/mm²
Note: Value should be greater than 0.
Archimedes' constant
Archimedes' constant is a mathematical constant that represents the ratio of the circumference of a circle to its diameter.
Symbol: π
Value: 3.14159265358979323846264338327950288

Other formulas in Bolt Loads in Gasket Joints category

​Go Bolt load under operating condition
Wm1=H+Hp
​Go Hydrostatic end force
H=Wm1-Hp
​Go Bolt Load under operating condition given Hydrostatic End Force
Wm1=((π4)(G)2P)+(2bgπGPm)
​Go Hydrostatic End Force given Bolt Load under Operating condition
H=Wm1-(2bgπGmP)

How to Evaluate Initial Bolt Load to seat Gasket Joint?

Initial Bolt Load to seat Gasket Joint evaluator uses Initial Bolt Load to Seat the Gasket Joint = pi*Width of u-collar in Gasket*Gasket Diameter*Gasket Unit Seating Load to evaluate the Initial Bolt Load to Seat the Gasket Joint, The Initial Bolt Load to seat Gasket Joint contact surface formula is defined as load in terms of either a concentrated force or a prescribed change in length. Initial Bolt Load to Seat the Gasket Joint is denoted by Wm2 symbol.

How to evaluate Initial Bolt Load to seat Gasket Joint using this online evaluator? To use this online evaluator for Initial Bolt Load to seat Gasket Joint, enter Width of u-collar in Gasket (bg), Gasket Diameter (G) & Gasket Unit Seating Load (ysl) and hit the calculate button.

FAQs on Initial Bolt Load to seat Gasket Joint

What is the formula to find Initial Bolt Load to seat Gasket Joint?
The formula of Initial Bolt Load to seat Gasket Joint is expressed as Initial Bolt Load to Seat the Gasket Joint = pi*Width of u-collar in Gasket*Gasket Diameter*Gasket Unit Seating Load. Here is an example- 1625.586 = pi*0.00421*0.032*3850000.
How to calculate Initial Bolt Load to seat Gasket Joint?
With Width of u-collar in Gasket (bg), Gasket Diameter (G) & Gasket Unit Seating Load (ysl) we can find Initial Bolt Load to seat Gasket Joint using the formula - Initial Bolt Load to Seat the Gasket Joint = pi*Width of u-collar in Gasket*Gasket Diameter*Gasket Unit Seating Load. This formula also uses Archimedes' constant .
Can the Initial Bolt Load to seat Gasket Joint be negative?
Yes, the Initial Bolt Load to seat Gasket Joint, measured in Force can be negative.
Which unit is used to measure Initial Bolt Load to seat Gasket Joint?
Initial Bolt Load to seat Gasket Joint is usually measured using the Newton[N] for Force. Exanewton[N], Meganewton[N], Kilonewton[N] are the few other units in which Initial Bolt Load to seat Gasket Joint can be measured.
Copied!