Drying Surface Area based on Initial to Final Weight of Moisture for Falling Rate Period evaluator uses Drying Surface Area = ((Initial Weight of Moisture for Falling Rate Period-Equilibrium Weight of Moisture)/(Falling Rate Drying Time*Rate of Constant Drying Period))*(ln((Initial Weight of Moisture for Falling Rate Period-Equilibrium Weight of Moisture)/(Final Weight of Moisture for Falling Rate Period-Equilibrium Weight of Moisture))) to evaluate the Drying Surface Area, The Drying Surface Area based on Initial to Final Weight of Moisture for Falling Rate Period formula is defined as the drying surface area required for drying from initial to final weight of moisture in the falling rate period for the specified drying conditions. Drying Surface Area is denoted by A symbol.
How to evaluate Drying Surface Area based on Initial to Final Weight of Moisture for Falling Rate Period using this online evaluator? To use this online evaluator for Drying Surface Area based on Initial to Final Weight of Moisture for Falling Rate Period, enter Initial Weight of Moisture for Falling Rate Period (Mi(Falling)), Equilibrium Weight of Moisture (MEq), Falling Rate Drying Time (tf), Rate of Constant Drying Period (Nc) & Final Weight of Moisture for Falling Rate Period (Mf(Falling)) and hit the calculate button.