Depression Head in Well at Time T given Pumping Stopped and Constant with Base 10 evaluator uses Depression Head after Pumping Stopped = Depression Head in Well 1/(10^((Constant Dependent on Base Soil*Time)/(Cross-Sectional Area of Well*2.303))) to evaluate the Depression Head after Pumping Stopped, The Depression Head in Well at Time T given Pumping Stopped and Constant with Base 10 formula is defined as the calculation of the value of depression head in the well when we have prior information of other parameters used. Depression Head after Pumping Stopped is denoted by hdp symbol.
How to evaluate Depression Head in Well at Time T given Pumping Stopped and Constant with Base 10 using this online evaluator? To use this online evaluator for Depression Head in Well at Time T given Pumping Stopped and Constant with Base 10, enter Depression Head in Well 1 (hw1), Constant Dependent on Base Soil (Kb), Time (t) & Cross-Sectional Area of Well (Acsw) and hit the calculate button.