Cross Section Area of Steel given Effective Tension evaluator uses Cross Section Area of Steel in Pipe = Effective Tension/((Mass Density of Steel-Density of Drilling Mud)*[g]*(Length of Pipe Hanging in Well-Coordinate measured Downward from Top)) to evaluate the Cross Section Area of Steel in Pipe, The Cross Section Area of Steel given Effective Tension, if the buoyant force caused by the mud is treated as a distributed force concluding, that there is a distributed buoyant force acting on the entire body equal to the weight of drilling mud displaced by the drill string. Cross Section Area of Steel in Pipe is denoted by As symbol.
How to evaluate Cross Section Area of Steel given Effective Tension using this online evaluator? To use this online evaluator for Cross Section Area of Steel given Effective Tension, enter Effective Tension (Te), Mass Density of Steel (ρs), Density of Drilling Mud (ρm), Length of Pipe Hanging in Well (LWell) & Coordinate measured Downward from Top (z) and hit the calculate button.