Batch Size given Average Production Cost evaluator uses Batch Size = Number of Tools Used*(Cost of a Tool*Time to Change One Tool+Cost of a Tool)/(Production Cost of Each Component-Cost of a Tool*(Setup Time+Machining Time)) to evaluate the Batch Size, The Batch Size given Average Production Cost refers to the total number of components produced in a single production run or set. It is an important factor in manufacturing as it impacts production efficiency, costs, and scheduling. Batch Size is denoted by Nb symbol.
How to evaluate Batch Size given Average Production Cost using this online evaluator? To use this online evaluator for Batch Size given Average Production Cost, enter Number of Tools Used (Nt), Cost of a Tool (Ct), Time to Change One Tool (tc), Production Cost of Each Component (Cpr), Setup Time (ts) & Machining Time (tm) and hit the calculate button.