Basic Setup time given Non-productive Time in Turning evaluator uses Basic Setup Time = (Non-Productive Time-Loading And Unloading Time-(Tool Positioning Time Per Operation*Number of Operations))*Batch Size-(Number of Tools Used*Setup Time Per Tool) to evaluate the Basic Setup Time, The Basic Setup time given Non-productive Time in Turning is the basic time required to load/unload the workpiece and position the tool for production for one component. Basic Setup Time is denoted by ts symbol.
How to evaluate Basic Setup time given Non-productive Time in Turning using this online evaluator? To use this online evaluator for Basic Setup time given Non-productive Time in Turning, enter Non-Productive Time (NPT), Loading And Unloading Time (tln), Tool Positioning Time Per Operation (tpt), Number of Operations (n0), Batch Size (Nb), Number of Tools Used (Nt) & Setup Time Per Tool (tst) and hit the calculate button.