Average Production Time of Each Component Formula

Fx Copy
LaTeX Copy
Average Production Time is the time taken to produce a single component out of a lot of produced batches. Check FAQs
tp=ts+tm+(NttcNb)
tp - Average Production Time?ts - Setup Time?tm - Machining Time?Nt - Number of Tools Used?tc - Time to Change One Tool?Nb - Batch Size?

Average Production Time of Each Component Example

With values
With units
Only example

Here is how the Average Production Time of Each Component equation looks like with Values.

Here is how the Average Production Time of Each Component equation looks like with Units.

Here is how the Average Production Time of Each Component equation looks like.

550Edit=54Edit+46Edit+(3Edit300Edit2Edit)
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Average Production Time of Each Component

Average Production Time of Each Component Solution

Follow our step by step solution on how to calculate Average Production Time of Each Component?

FIRST Step Consider the formula
tp=ts+tm+(NttcNb)
Next Step Substitute values of Variables
tp=54s+46s+(3300s2)
Next Step Prepare to Evaluate
tp=54+46+(33002)
LAST Step Evaluate
tp=550s

Average Production Time of Each Component Formula Elements

Variables
Average Production Time
Average Production Time is the time taken to produce a single component out of a lot of produced batches.
Symbol: tp
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Machining Time
Machining Time is the time when a machine is actually processing something. Generally, machining time is the term used when there is a removal of unwanted material.
Symbol: tm
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Time to Change One Tool
Time to Change One Tool is the measure of time it takes to change one tool during machining.
Symbol: tc
Measurement: TimeUnit: s
Note: Value should be greater than 0.
Batch Size
Batch Size is the count of similar kinds of products to be manufactured.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other formulas in Average Production Time category

​Go Machining Time of Each Component given Average Production Time
tm=tp-ts-(NttcNb)
​Go Non-Productive Time for Each Component given Average Production Time
ts=tp-(tm+(NttcNb))
​Go Time for changing one Tool given Average Production Time
tc=(tp-(ts+tm))NbNt
​Go Batch Size given Average Production Time
Nb=tcNttp-(ts+tm)

How to Evaluate Average Production Time of Each Component?

Average Production Time of Each Component evaluator uses Average Production Time = Setup Time+Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size) to evaluate the Average Production Time, The Average Production Time of Each Component is defined as the time taken in producing a single component from scratch including all necessary operations and processes. Average Production Time is denoted by tp symbol.

How to evaluate Average Production Time of Each Component using this online evaluator? To use this online evaluator for Average Production Time of Each Component, enter Setup Time (ts), Machining Time (tm), Number of Tools Used (Nt), Time to Change One Tool (tc) & Batch Size (Nb) and hit the calculate button.

FAQs on Average Production Time of Each Component

What is the formula to find Average Production Time of Each Component?
The formula of Average Production Time of Each Component is expressed as Average Production Time = Setup Time+Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size). Here is an example- 550 = 54+46+(3*300/2).
How to calculate Average Production Time of Each Component?
With Setup Time (ts), Machining Time (tm), Number of Tools Used (Nt), Time to Change One Tool (tc) & Batch Size (Nb) we can find Average Production Time of Each Component using the formula - Average Production Time = Setup Time+Machining Time+(Number of Tools Used*Time to Change One Tool/Batch Size).
Can the Average Production Time of Each Component be negative?
No, the Average Production Time of Each Component, measured in Time cannot be negative.
Which unit is used to measure Average Production Time of Each Component?
Average Production Time of Each Component is usually measured using the Second[s] for Time. Millisecond[s], Microsecond[s], Nanosecond[s] are the few other units in which Average Production Time of Each Component can be measured.