Average Production Cost of Each Component Given Total Production Cost evaluator uses Production Cost of Each Component = Total Production Cost/Batch Size to evaluate the Production Cost of Each Component, The Average Production Cost of each component given total production cost is defined as the total cost of producing a single component from scratch including all necessary operations and processes. The reason for this is the extended costs such as the cost of tools and operating costs etc. This makes the Average Production Cost becomes quite higher for a single product than when measured over batch size. Production Cost of Each Component is denoted by Cpr symbol.
How to evaluate Average Production Cost of Each Component Given Total Production Cost using this online evaluator? To use this online evaluator for Average Production Cost of Each Component Given Total Production Cost, enter Total Production Cost (Tp) & Batch Size (Nb) and hit the calculate button.