Average Production Cost of each component Formula

Fx Copy
LaTeX Copy
Average production cost involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses. Check FAQs
ca=Ct(ts+tm)+(NtNb)((CtT)+Ct)
ca - Average Production Cost?Ct - Cost of a Tool?ts - Setup Time?tm - Machining Time?Nt - Number of Tools Used?Nb - Batch Size?T - Tool Changing Time?

Average Production Cost of each component Example

With values
With units
Only example

Here is how the Average Production Cost of each component equation looks like with Values.

Here is how the Average Production Cost of each component equation looks like with Units.

Here is how the Average Production Cost of each component equation looks like.

9240Edit=80Edit(0.45Edit+1.15Edit)+(3Edit2Edit)((80Edit0.2Edit)+80Edit)
You are here -
HomeIcon Home » Category Engineering » Category Production Engineering » Category Metal Machining » fx Average Production Cost of each component

Average Production Cost of each component Solution

Follow our step by step solution on how to calculate Average Production Cost of each component?

FIRST Step Consider the formula
ca=Ct(ts+tm)+(NtNb)((CtT)+Ct)
Next Step Substitute values of Variables
ca=80(0.45min+1.15min)+(32)((800.2min)+80)
Next Step Convert Units
ca=80(27s+69s)+(32)((8012s)+80)
Next Step Prepare to Evaluate
ca=80(27+69)+(32)((8012)+80)
LAST Step Evaluate
ca=9240

Average Production Cost of each component Formula Elements

Variables
Average Production Cost
Average production cost involves accounting for various factors, including material costs, labor, machine operating costs, tool costs, overhead, and other related expenses.
Symbol: ca
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Cost of a Tool
Cost of a tool is a multifaceted consideration that includes the initial purchase price, maintenance costs, tool life, and the impact on overall production costs.
Symbol: Ct
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Setup Time
Setup Time of each component is the time required to load/unload the workpiece and position the tool for production for one component.
Symbol: ts
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Machining Time
Machining time refers to the total time required to complete a specific machining operation on a workpiece.
Symbol: tm
Measurement: TimeUnit: min
Note: Value should be greater than 0.
Number of Tools Used
The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Symbol: Nt
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Batch Size
Batch size refers to the number of identical parts produced in a single production run or cycle.
Symbol: Nb
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.
Tool Changing Time
Tool changing time referred to as tool change time, is the duration required to remove a used tool and replace it with a new one.
Symbol: T
Measurement: TimeUnit: min
Note: Value should be greater than 0.

Other formulas in Average Production Cost category

​Go Number of Tools used given Average Production Cost
Nt=NbCpr-Ct(ts+tm)Cttc+Ct
​Go Number of Tools used given Average Production Time
Nt=Nbtp-(ts+tm)tc

How to Evaluate Average Production Cost of each component?

Average Production Cost of each component evaluator uses Average Production Cost = Cost of a Tool*(Setup Time+Machining Time)+(Number of Tools Used/Batch Size)*((Cost of a Tool*Tool Changing Time)+Cost of a Tool) to evaluate the Average Production Cost, The Average Production Cost of each component is defined as the total cost of producing a single component from scratch including all necessary operations and processes. The reason for this is the extended costs such as the cost of tools and operating costs etc. This makes the Average Production Cost becomes quite higher for a single product than when measured over batch size. Average Production Cost is denoted by ca symbol.

How to evaluate Average Production Cost of each component using this online evaluator? To use this online evaluator for Average Production Cost of each component, enter Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm), Number of Tools Used (Nt), Batch Size (Nb) & Tool Changing Time (T) and hit the calculate button.

FAQs on Average Production Cost of each component

What is the formula to find Average Production Cost of each component?
The formula of Average Production Cost of each component is expressed as Average Production Cost = Cost of a Tool*(Setup Time+Machining Time)+(Number of Tools Used/Batch Size)*((Cost of a Tool*Tool Changing Time)+Cost of a Tool). Here is an example- 9240 = 80*(27+69)+(3/2)*((80*12)+80).
How to calculate Average Production Cost of each component?
With Cost of a Tool (Ct), Setup Time (ts), Machining Time (tm), Number of Tools Used (Nt), Batch Size (Nb) & Tool Changing Time (T) we can find Average Production Cost of each component using the formula - Average Production Cost = Cost of a Tool*(Setup Time+Machining Time)+(Number of Tools Used/Batch Size)*((Cost of a Tool*Tool Changing Time)+Cost of a Tool).
Copied!