Area of Cross-section while Running Full given Proportionate Discharge Formula

Fx Copy
LaTeX Copy
The Area of Running Full Sewers refers to the total cross-sectional area of the pipe when it is completely filled with fluid. Check FAQs
A=aVsVPq
A - Area of Running Full Sewers?a - Area of Partially Full Sewers?Vs - Velocity in a Partially Running Sewer?V - Velocity While Running Full?Pq - Proportionate Discharge?

Area of Cross-section while Running Full given Proportionate Discharge Example

With values
With units
Only example

Here is how the Area of Cross-section while Running Full given Proportionate Discharge equation looks like with Values.

Here is how the Area of Cross-section while Running Full given Proportionate Discharge equation looks like with Units.

Here is how the Area of Cross-section while Running Full given Proportionate Discharge equation looks like.

5.4061Edit=3.8Edit4.6Edit6.01Edit0.538Edit
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Environmental Engineering » fx Area of Cross-section while Running Full given Proportionate Discharge

Area of Cross-section while Running Full given Proportionate Discharge Solution

Follow our step by step solution on how to calculate Area of Cross-section while Running Full given Proportionate Discharge?

FIRST Step Consider the formula
A=aVsVPq
Next Step Substitute values of Variables
A=3.84.6m/s6.01m/s0.538
Next Step Prepare to Evaluate
A=3.84.66.010.538
Next Step Evaluate
A=5.40610754071591
LAST Step Rounding Answer
A=5.4061

Area of Cross-section while Running Full given Proportionate Discharge Formula Elements

Variables
Area of Running Full Sewers
The Area of Running Full Sewers refers to the total cross-sectional area of the pipe when it is completely filled with fluid.
Symbol: A
Measurement: AreaUnit:
Note: Value should be greater than 0.
Area of Partially Full Sewers
The Area of Partially Full Sewers refers to the cross-sectional flow area at a given water depth, crucial for hydraulic and flow rate calculations.
Symbol: a
Measurement: AreaUnit:
Note: Value should be greater than 0.
Velocity in a Partially Running Sewer
Velocity in a Partially Running Sewer is the speed of flow when the sewer isn't fully filled, influenced by depth and slope.
Symbol: Vs
Measurement: SpeedUnit: m/s
Note: Value should be greater than 0.
Velocity While Running Full
Velocity while Running Full refers to the speed of fluid flow in a pipe when it's completely filled, influenced by pipe slope and roughness.
Symbol: V
Measurement: SpeedUnit: m/s
Note: Value should be greater than 0.
Proportionate Discharge
Proportionate Discharge is the ratio of discharge while running partially full to running full.
Symbol: Pq
Measurement: NAUnit: Unitless
Note: Value should be greater than 0.

Other formulas in Proportionate Discharge category

​Go Proportionate Discharge using Discharge when Pipe Running Full
Pq=qQ
​Go Proportionate Discharge given Central Angle
Pq=((central360π180)-(sin(central)2π))(1-(360π180)sin(central)2πcentral)
​Go Proportionate Discharge given Area of Cross-Section
Pq=VsaVA
​Go Discharge when Pipe is Running Full using Proportionate Discharge
Q=(qPq)

How to Evaluate Area of Cross-section while Running Full given Proportionate Discharge?

Area of Cross-section while Running Full given Proportionate Discharge evaluator uses Area of Running Full Sewers = (Area of Partially Full Sewers*Velocity in a Partially Running Sewer)/(Velocity While Running Full*Proportionate Discharge) to evaluate the Area of Running Full Sewers, Area of Cross-section while Running Full given Proportionate Discharge is defined as the total cross-sectional area of the pipe when it is completely filled with fluid. Area of Running Full Sewers is denoted by A symbol.

How to evaluate Area of Cross-section while Running Full given Proportionate Discharge using this online evaluator? To use this online evaluator for Area of Cross-section while Running Full given Proportionate Discharge, enter Area of Partially Full Sewers (a), Velocity in a Partially Running Sewer (Vs), Velocity While Running Full (V) & Proportionate Discharge (Pq) and hit the calculate button.

FAQs on Area of Cross-section while Running Full given Proportionate Discharge

What is the formula to find Area of Cross-section while Running Full given Proportionate Discharge?
The formula of Area of Cross-section while Running Full given Proportionate Discharge is expressed as Area of Running Full Sewers = (Area of Partially Full Sewers*Velocity in a Partially Running Sewer)/(Velocity While Running Full*Proportionate Discharge). Here is an example- 5.467079 = (3.8*4.6)/(6.01*0.538).
How to calculate Area of Cross-section while Running Full given Proportionate Discharge?
With Area of Partially Full Sewers (a), Velocity in a Partially Running Sewer (Vs), Velocity While Running Full (V) & Proportionate Discharge (Pq) we can find Area of Cross-section while Running Full given Proportionate Discharge using the formula - Area of Running Full Sewers = (Area of Partially Full Sewers*Velocity in a Partially Running Sewer)/(Velocity While Running Full*Proportionate Discharge).
Can the Area of Cross-section while Running Full given Proportionate Discharge be negative?
No, the Area of Cross-section while Running Full given Proportionate Discharge, measured in Area cannot be negative.
Which unit is used to measure Area of Cross-section while Running Full given Proportionate Discharge?
Area of Cross-section while Running Full given Proportionate Discharge is usually measured using the Square Meter[m²] for Area. Square Kilometer[m²], Square Centimeter[m²], Square Millimeter[m²] are the few other units in which Area of Cross-section while Running Full given Proportionate Discharge can be measured.
Copied!