28 Day Concrete Compressive Strength given Development Length for Hooked Bar Formula

Fx Copy
LaTeX Copy
28 Day Compressive Strength of Concrete is defined as the strength of the concrete after 28 days of using it. Check FAQs
fc=(1200DbLd)2
fc - 28 Day Compressive Strength of Concrete?Db - Bar Diameter?Ld - Development Length?

28 Day Concrete Compressive Strength given Development Length for Hooked Bar Example

With values
With units
Only example

Here is how the 28 Day Concrete Compressive Strength given Development Length for Hooked Bar equation looks like with Values.

Here is how the 28 Day Concrete Compressive Strength given Development Length for Hooked Bar equation looks like with Units.

Here is how the 28 Day Concrete Compressive Strength given Development Length for Hooked Bar equation looks like.

15.0001Edit=(12001.291Edit400Edit)2
You are here -
HomeIcon Home » Category Engineering » Category Civil » Category Structural Engineering » fx 28 Day Concrete Compressive Strength given Development Length for Hooked Bar

28 Day Concrete Compressive Strength given Development Length for Hooked Bar Solution

Follow our step by step solution on how to calculate 28 Day Concrete Compressive Strength given Development Length for Hooked Bar?

FIRST Step Consider the formula
fc=(1200DbLd)2
Next Step Substitute values of Variables
fc=(12001.291m400mm)2
Next Step Convert Units
fc=(12001.291m0.4m)2
Next Step Prepare to Evaluate
fc=(12001.2910.4)2
Next Step Evaluate
fc=15000129Pa
Next Step Convert to Output's Unit
fc=15.000129MPa
LAST Step Rounding Answer
fc=15.0001MPa

28 Day Concrete Compressive Strength given Development Length for Hooked Bar Formula Elements

Variables
28 Day Compressive Strength of Concrete
28 Day Compressive Strength of Concrete is defined as the strength of the concrete after 28 days of using it.
Symbol: fc
Measurement: StressUnit: MPa
Note: Value should be greater than 0.
Bar Diameter
Bar Diameter are most usually comprised to 12, 16, 20, and 25 mm.
Symbol: Db
Measurement: LengthUnit: m
Note: Value should be greater than 0.
Development Length
Development Length is the amount of reinforcement or bar length needed to be embedded into the column to establish the desired bond strength between the concrete and steel.
Symbol: Ld
Measurement: LengthUnit: mm
Note: Value should be greater than 0.

Other formulas in Shear Reinforcement category

​Go Ultimate Shear Capacity of Beam Section
Vn=(Vc+Vs)
​Go Nominal Shear Strength of Concrete
Vc=(1.9fc+((2500ρw)(VuDcentroidBM)))(bwDcentroid)
​Go Nominal Shear Strength Provided by Reinforcement
Vs=Vn-Vc
​Go Area of Steel Required in Vertical Stirrups
As=VssfysteelDcentroid

How to Evaluate 28 Day Concrete Compressive Strength given Development Length for Hooked Bar?

28 Day Concrete Compressive Strength given Development Length for Hooked Bar evaluator uses 28 Day Compressive Strength of Concrete = ((1200*Bar Diameter)/(Development Length))^2 to evaluate the 28 Day Compressive Strength of Concrete, The 28 Day Concrete compressive strength given development length for hooked bar is defined as the minimum compressive strength at which the concrete should fail in the respective Standard Compressive tests. 28 Day Compressive Strength of Concrete is denoted by fc symbol.

How to evaluate 28 Day Concrete Compressive Strength given Development Length for Hooked Bar using this online evaluator? To use this online evaluator for 28 Day Concrete Compressive Strength given Development Length for Hooked Bar, enter Bar Diameter (Db) & Development Length (Ld) and hit the calculate button.

FAQs on 28 Day Concrete Compressive Strength given Development Length for Hooked Bar

What is the formula to find 28 Day Concrete Compressive Strength given Development Length for Hooked Bar?
The formula of 28 Day Concrete Compressive Strength given Development Length for Hooked Bar is expressed as 28 Day Compressive Strength of Concrete = ((1200*Bar Diameter)/(Development Length))^2. Here is an example- 1.5E-5 = ((1200*1.291)/(0.4))^2.
How to calculate 28 Day Concrete Compressive Strength given Development Length for Hooked Bar?
With Bar Diameter (Db) & Development Length (Ld) we can find 28 Day Concrete Compressive Strength given Development Length for Hooked Bar using the formula - 28 Day Compressive Strength of Concrete = ((1200*Bar Diameter)/(Development Length))^2.
Can the 28 Day Concrete Compressive Strength given Development Length for Hooked Bar be negative?
No, the 28 Day Concrete Compressive Strength given Development Length for Hooked Bar, measured in Stress cannot be negative.
Which unit is used to measure 28 Day Concrete Compressive Strength given Development Length for Hooked Bar?
28 Day Concrete Compressive Strength given Development Length for Hooked Bar is usually measured using the Megapascal[MPa] for Stress. Pascal[MPa], Newton per Square Meter[MPa], Newton per Square Millimeter[MPa] are the few other units in which 28 Day Concrete Compressive Strength given Development Length for Hooked Bar can be measured.
Copied!