FAQ

What is the Time required for Waves crossing Fetch?
Time required for Waves crossing Fetch under Wind Velocity to become Fetch Limited. Time required for Waves crossing Fetch is usually measured using the Second for Time. Note that the value of Time required for Waves crossing Fetch is always negative.
Can the Time required for Waves crossing Fetch be negative?
Yes, the Time required for Waves crossing Fetch, measured in Time can be negative.
What unit is used to measure Time required for Waves crossing Fetch?
Time required for Waves crossing Fetch is usually measured using the Second[s] for Time. Millisecond[s], Microsecond[s], Nanosecond[s] are the few other units in which Time required for Waves crossing Fetch can be measured.
Copied!