FAQ

What is the Time of Drawdown (t1) in Wells?
Time of Drawdown (t1) in Wells is the total period for the difference between the pumping water level and the static (non-pumping) water level for wells. Time of Drawdown (t1) in Wells is usually measured using the Second for Time. Note that the value of Time of Drawdown (t1) in Wells is always positive.
Can the Time of Drawdown (t1) in Wells be negative?
No, the Time of Drawdown (t1) in Wells, measured in Time cannot be negative.
What unit is used to measure Time of Drawdown (t1) in Wells?
Time of Drawdown (t1) in Wells is usually measured using the Second[s] for Time. Millisecond[s], Microsecond[s], Nanosecond[s] are the few other units in which Time of Drawdown (t1) in Wells can be measured.
Copied!