FormulaDen.com
Physics
Chemistry
Math
Chemical Engineering
Civil
Electrical
Electronics
Electronics and Instrumentation
Materials Science
Mechanical
Production Engineering
Financial
Health
You are here
-
Home
»
Engineering
»
Civil
»
Irrigation Engineering
Length of Transition in Cross Drainage Work Formulas
Length of transition is the distance required in transitioning the road from normal to full super elevation. And is denoted by L
f
. Length of Transition is usually measured using the Meter for Length. Note that the value of Length of Transition is always positive.
Cross Drainage Work formulas that make use of Length of Transition
f
x
Mitra's Hyperbolic Transition when Water Depth remains Constant
Go
f
x
Chaturvedi's Semi Cubical Parabolic Transition when Water Depth remains Contant
Go
FAQ
What is the Length of Transition?
Length of transition is the distance required in transitioning the road from normal to full super elevation. Length of Transition is usually measured using the Meter for Length. Note that the value of Length of Transition is always positive.
Can the Length of Transition be negative?
No, the Length of Transition, measured in Length cannot be negative.
What unit is used to measure Length of Transition?
Length of Transition is usually measured using the Meter[m] for Length. Millimeter[m], Kilometer[m], Decimeter[m] are the few other units in which Length of Transition can be measured.
Let Others Know
✖
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!