FormulaDen.com
Physics
Chemistry
Math
Chemical Engineering
Civil
Electrical
Electronics
Electronics and Instrumentation
Materials Science
Mechanical
Production Engineering
Financial
Health
You are here
-
Home
»
Engineering
»
Production Engineering
»
Metal Machining
Initial Work Piece Weight in Production Cost Formulas
Initial Work Piece Weight is defined as the weight of the work piece before undergoing machining operation. And is denoted by W. Initial Work Piece Weight is usually measured using the Kilogram for Weight. Note that the value of Initial Work Piece Weight is always positive.
Production Cost formulas that make use of Initial Work Piece Weight
f
x
Factor to allow for Machining overheads given Total rate for Machining and Operator
Go
f
x
Factor to allow for Operator overheads given Total rate for Machining and Operator
Go
f
x
Number of shifts given Total rate for Machining and Operator
Go
FAQ
What is the Initial Work Piece Weight?
Initial Work Piece Weight is defined as the weight of the work piece before undergoing machining operation. Initial Work Piece Weight is usually measured using the Kilogram for Weight. Note that the value of Initial Work Piece Weight is always positive.
Can the Initial Work Piece Weight be negative?
No, the Initial Work Piece Weight, measured in Weight cannot be negative.
What unit is used to measure Initial Work Piece Weight?
Initial Work Piece Weight is usually measured using the Kilogram[kg] for Weight. Gram[kg], Milligram[kg], Ton (Metric)[kg] are the few other units in which Initial Work Piece Weight can be measured.
Let Others Know
✖
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!