FormulaDen.com
Physics
Chemistry
Math
Chemical Engineering
Civil
Electrical
Electronics
Electronics and Instrumentation
Materials Science
Mechanical
Production Engineering
Financial
Health
You are here
-
Home
»
Engineering
»
Civil
»
Engineering Hydrology
Cross-Sectional Area at Point 1 in Prediction of Sediment Distribution Formulas
Cross-Sectional Area at Point 1 is defined as the area of the section at point 1. And is denoted by A
1
. Cross-Sectional Area at Point 1 is usually measured using the Square Meter for Area. Note that the value of Cross-Sectional Area at Point 1 is always negative.
Prediction of Sediment Distribution formulas that make use of Cross-Sectional Area at Point 1
f
x
Volume of Sediment Deposited between two Consecutive Heights by Average End Area Method
Go
f
x
Volume of Sediment Deposition given Incremental Area
Go
f
x
Volume of Sediment Deposited between two Consecutive Heights by Weighted Area Method
Go
FAQ
What is the Cross-Sectional Area at Point 1?
Cross-Sectional Area at Point 1 is defined as the area of the section at point 1. Cross-Sectional Area at Point 1 is usually measured using the Square Meter for Area. Note that the value of Cross-Sectional Area at Point 1 is always negative.
Can the Cross-Sectional Area at Point 1 be negative?
Yes, the Cross-Sectional Area at Point 1, measured in Area can be negative.
What unit is used to measure Cross-Sectional Area at Point 1?
Cross-Sectional Area at Point 1 is usually measured using the Square Meter[m²] for Area. Square Kilometer[m²], Square Centimeter[m²], Square Millimeter[m²] are the few other units in which Cross-Sectional Area at Point 1 can be measured.
Let Others Know
✖
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!