FAQ

What is the Cost Index 2?
Cost Index 2 is a ratio used in cost estimation and economic analysis in engineering and construction projects.
Can the Cost Index 2 be negative?
{YesorNo}, the Cost Index 2, measured in {OutputVariableMeasurementName} {CanorCannot} be negative.
Copied!